asdasdasd
GND - Copper Area: incomplete connection.
Hello everyone, I'm having this strange issue, from schematics the device goes to GND as the picture below: From the layout, I have both copper areas for TOP and BOTTOM layer connected to GND: But I get the message from DRC test "incomplete connection, please check". I assumed that the copper areas would do the grounding for me, is this right? (this is happening for all components GNDs) Thanks! #PCB#
Vinícius Rodrigues 2020-09-18 15:00:59 comment 1 0 Circuit Design