How are these quantities worked out?
I've just got a quote for 5 boards to be assembled. The list of the selected parts is,

OK, in the middle of the list is SPK1 - 1 per board = 5 needed.
However, C1 - 1 per board - why 20 needed? R6, R7 - why 100 needed?
A lot of the numbers above aren't divisible by 5. I.E. 34, 49, 62, 29.
Most of the quantities seem to be wrong.
Thanks for the help.
Mike.
Edit, OK, I can see that some are minimum quantities but the very top one isn't. BC857 - there are 6 on each board so the quantity should be 30 and the minimum is 15. So why 34?